DRC–Angola $1.5 Billion Power Corridor: Energy Security or Sovereignty Trade-Off?

Summary

The Democratic Republic of Congo (DRC) has signed a preliminary agreement with Hydro-Link, an affiliate of the U.S.-based Symbion Power, to construct a 1,160-kilometre high-voltage transmission line connecting Angola’s hydroelectric network to the DRC’s mineral heartland in Lualaba and Haut-Katanga provinces.

Valued at approximately $1.5 billion, the line will deliver up to 1,200 MW from Angola’s Laúca and Caculo Cabaça hydro plants directly to the copper–cobalt belt, aiming to displace costly diesel generation at major mines and stabilize electricity supply across the southern industrial corridor.

The project is jointly structured between the DRC government, Hydro-Link, and several development-finance and export-credit institutions, with feasibility studies and financing arrangements expected to conclude by mid-2026.

Project Overview

  • Developer: Hydro-Link Ltd., subsidiary of Symbion Power (U.S.)
  • Capacity: 1,200 MW, 400 kV double-circuit transmission line
  • Route: From northern Angola’s hydro grid to Kasai, then east to Kolwezi and Likasi
  • Financing: Mixed structure combining export-credit guarantees, DFI loans, and private investment
  • Timeline: Construction targeted for 2027–2030, subject to security and environmental clearance

This agreement builds upon a framework signed in June 2025 between Hydro-Link and Angola, authorizing cross-border power exports from Laúca to the DRC.

Strategic and Economic Rationale

The DRC’s mining sector, particularly in copper and cobalt extraction, faces chronic energy shortages that constrain production and raise operational costs. Over 60% of the region’s mining power currently comes from diesel or intermittent grid supply.

Key Benefits

  • Cost reduction: Reliable hydroelectric imports could lower mining energy costs by 30–40%.
  • Operational stability: Consistent grid access would reduce outages and enhance processing capacity for EV-related metals.
  • Green credentials: Replacement of diesel generation aligns DRC mining exports with low-carbon certification standards demanded by global battery manufacturers.

For Angola, the deal monetizes its hydro surplus and deepens its influence within the Southern African Power Pool (SAPP) while expanding energy diplomacy with Washington and Kinshasa.

Security and Implementation Challenges

The 1,160-km route will traverse provinces characterized by infrastructure degradation, illegal mining, and localized insecurity. African Security Analysis (ASA) field sources note several vulnerability corridors, notably between Kasai-Central and Lualaba, where theft, sabotage, and community tensions could impede progress.

Kinshasa and Luanda are preparing a joint energy-security task force to oversee corridor protection, while development partners advocate for transparent land-compensation mechanisms to prevent conflict with affected communities.

Governance and Structural Constraints

Despite holding one of the world’s largest untapped hydroelectric potentials—estimated at 100,000 MW, with over 40,000 MW at the Inga complex alone—the DRC continues to import electricity to power its mines.

Persistent challenges include:

  • Aging infrastructure (Inga I & II operating far below capacity).
  • Chronic underinvestment in maintenance and expansion.
  • Institutional gridlock between the national utility SNEL and private operators.
  • Weak governance discouraging strategic public–private partnerships.

The DRC’s inability to mobilize domestic generation reflects a deeper issue: not scarcity of resources, but systemic governance paralysis that undermines long-term energy sovereignty.

Independent Assessment

African Security Analysis (ASA) finds that while the Angola–DRC power corridor offers a pragmatic and immediate fix to the mining sector’s energy crisis, it simultaneously exposes the contradictions of Congolese energy policy.

In June 2025, Hydro-Link’s initial deal with Angola laid the foundation for cross-border transmission from Laúca to Kolwezi. That framework has now evolved into a U.S.–DRC preliminary agreement signed during the DRC–U.S. Economic and Investment Forum (October 14–15, 2025), formalizing the $1.5 billion project.

However, the arrangement raises a fundamental question: Why must the DRC import power from a neighbour when it possesses one of the greatest hydroelectric potentials on the planet?

With over 100,000 MW of exploitable potential—40,000 MW from Inga alone—the DRC could become a continental exporter of electricity. Yet decades of poor planning, institutional corruption, and technical neglect have left the country dependent on external grids. This dependence erodes industrial autonomy and weakens national leverage over one of its most strategic assets: energy.

The reliance on Angolan supply, while expedient, reflects a loss of energy sovereignty. Instead of channelling $1.5 billion into foreign imports, a comparable investment could rehabilitate the Inga–Shaba line, modernize converters, and restore local generation capacity within two to three years—creating domestic jobs, securing energy independence, and reinforcing national pride.

ASA concludes that the DRC’s core problem is not access to resources, but governance failure:

  • Inga I & II operate at less than half design capacity.
  • Public investment remains chronically delayed.
  • Coordination between SNEL and private operators is weak.
  • Oversight mechanisms for transparency and accountability are insufficient.

Rehabilitating Inga–Shaba, at a cost estimated between $1–5 billion, would reestablish domestic control over 1,700 km of critical transmission infrastructure and secure a sustainable, sovereign power base for industrial growth.

Between Urgency and Autonomy

The $1.5 billion Angola–DRC power link promises rapid energy relief for mining output and investor confidence, but it also symbolizes a strategic trade-off — short-term stability at the expense of long-term sovereignty.

If effectively managed, it could lower costs and stabilize production in the world’s most important cobalt corridor. Yet, in ASA’s professional judgment, true energy security for the DRC will only emerge from domestic rehabilitation, governance reform, and sovereign control over its power assets.

Hydro imports can power the mines; only national reform can power the nation.

Share this article
ASA Logo

ASA Situation Reports™

ASA Logo

Discover More

Sudan, Central African Republic, Chad, South Sudan, Ethiopia 20 okt. 2025 16:33

Drone Strike Eliminates Prominent Tribal Leader in RSF-Controlled North Kordofan

ASA has examined reports from Sudan War Monitor and additional sources, revealing a targeted drone airstrike in North Kordofan State that claimed the life of Paramount Chief Suleiman Jaber Jumaa Sahl, a key influencer within the Arab Majaneen tribe, alongside ten senior elders.

DRC, Angola 20 okt. 2025 09:52

DRC–Angola $1.5 Billion Power Corridor: Energy Security or Sovereignty Trade-Off?

The DRC has signed a preliminary agreement with Hydro-Link, an affiliate of the U.S.-based Symbion Power, to construct a 1,160-kilometre high-voltage transmission line connecting Angola’s hydroelectric network to the DRC’s mineral heartland in Lualaba and Haut-Katanga provinces.

Request for interest

Contact us to find out how our security services can support you.

We operate in almost all countries in Africa, including high-risk environments, monitoring and analyze ongoing conflicts, the hotspots and the potential upcoming threats on the continent. Every day. Around the clock.